Note ,the previous Jan 97 equipment request was designed to establish a rough estimate of equipment that would be needed for the UVAG. The list posted below includes much more than just equipment and furniture. Please contact me at kriz@wave.esm.vt.edu if you want to comment, add or delete items from the list posted below. I know this list first appears to be an exercise in illusions of grandeur but it never hurts to ask.
Item Quantity Description Cost Est., $ Apr 97 1 1 Onyx2 Infinite Reality, 12xR10000, 3GB memory, 6-IR pipes, 12 RMs, 3 Racks (1999 CAVE upgrade System) with 5 year warranty. $1,355,947.25 2 14 WT5-1P195MX14, Octane workstation, 20" CRT, 1xR10K, 4MB tex. RAM, 256MB RAM, 9GB disk, External CD-ROM, 5 year warranty $ 617,321.50 3 1 R1-H6402-IR64-2, Onyx 2-IRs, 2xR10K, 20" CRT, 9GB disk, 512MB RAM, 5 year warranty System will be used for the I-Wall $ 371,947.00 4 7 Electrohome Video Projects for I-Wall $ 175,000.00 5 10 O2 workstation for offices,1xR10K, 17" CRT, 64MB RAM, 4GB disk, 5 year warranty. $ 174,276.50 _________________________________ SGI Hardware Total: $2,694,492.20 Non-SGI Workstations* 6 4 High-End Pentium Workstations for running Sense8 and other visualization tools unique to NT systems $ 120,000.00 SGI-Software for Lab and Offices 7 24 Varsity for worstations, $500/workstation $ 12,000.00 8 1 Varsity for Onyx2, $1800/workstation $ 1,800.00 Software (5-year site license maintenance) 9 50 AVS site licenses at $12.5K/yr $ 175,000.00 10 14 PARADIGM: Vega site licenses at $3.5K/yr/seat $ 245,000.00 11 14 Alias|Wavefront site licenses at $3K/yr/seat $ 240,000.00 12 10 MSI site licenses at $5.5K/yr $ 77,000.00 13 unlimited Sense8 site licenses at $12.55K/yr $ 50,000.00 _______________________________ Software Total: $ 802,600.00 ________________________________________ Hardware/Software Total: $3,617,092.20 Personnel (5 years) 14 1 CAVE Programmer/Instructor, G16-1, $44K/yr $ 220,000.00 15 1 CAVE system & Lab Mngr, G15-1, $40K/yr $ 200,000.00 16 1 UVAG Coordinator, G10-1, $26K/yr $ 130,000.00 17 2 Faculty release time AY & Summer, $112K/yr $ 560,000.00 18 2 GRAs (including tuition), $48K/yr $ 240,000.00 19 Training, $5k/yr $ 25,000.00 _________________________________________ Personnel & Training Total: $1,375,000.00 Office Equipment & Expenses 20 3 Network Printers, $2K each $ 6,000.00 21 1 Copy machine, (5 year maint), $35K $ 35,000.00 22 1 FAX machine (5 year maint), $14K $ 15,000.00 23 2 Personal Office computers + software $ 11,000.00 24 2 Security systems $ 12,000.00 25 26/4 10baseT / OC3 installation (5 years) $ 5,190.00 26 Office supplies, $3K/yr $ 15,000.00 _________________________________________ Office equipment Total: $ 99,190.00 Furniture 2nd & 3rd Floor** 27 5 Office suite: desk, chairs, bookshelves, etc. $ 150,000.00 28 1 Conference room: Table, 15 chairs, etc. $ 16,000.00 29 14 Workstation tables with 28 chairs $ 14,400.00 _________________________________ Furnitutre Total: $ 180,400.00 _________________________________ Total 5 Year Budget $5,271,682.20 ___________________________________________________________ * This is a rough estimate on high end workstation that would run Sense8 software and other nonSGI CAVE compatible software. A more accurate estimate will be given once someone at VT has configured such a system and can provide some quidance on what to buy. ** Estimated pices by telephone conversation. More accurate prices will be quoted here after we receive a quote from Harris Furniture.