Scientific Visual Data Analysis and Multimedia
Project Contract
กก
Borinara Park
Visualization of Complex Reinforcing
Bar Structure in the CAVE
A concrete cast-in-place segmental
bridge on the Smart Road includes structural complexity at the joint section
of the bridge slab and the piers. The use of reinforcing steel (rebar)
is so massive that it is hardly achieved to visualize this section with
only the 2D drawings. Even though the CAD file (MicroStation) is available
it is still limited in the sense that it does not provide 3D feeling of
the objects which is vital element for establishing the right procedure
of the rebar placement operation.
The main objectives of the project will be:
CAVE, MicroStation, 3D-Studio and
other tools if necessary